Meeting
with Hon'ble Minister of Transport & Power
Govt. of NCT of Delhi
12th
May, 2005 at 3.00 p.m.
at Minister's Conference Room, 8th Level, Delhi Secretariat



Agenda
of the Meeting
1.
Construction of 66 K.V. Grid adjacent to Uttam Nagar,
Bus Terminal.
2.
Shifting of a portion of 66 K.V. High Tension Electrical
Tower Lines from Pankha Road to Rewari Line near Chanakya
Place.
3.
Non implimentation of schemes related to Repair /
Maintenance and Augmentation works in Uttam Nagar
Group of Colonies and Janak Puri. (list enclosed)
4.
Provision of double over hang street lights central
verge of adjacent to Dist. Centre crossing to BSES
Office.
5.
Removal of scrap / abandoned Matador adajacent to
BSES office C2B.
6.
Schedule for load shading
7.
Provision of Street Lights Poles LOP in Uttam Nagar
Group of Colonies (Mahendra Park, Jeewan Park, Milap
Nagar, H - Block, M - Block, Prem Nagar, Indra Park
(RZ-6, RZ-43, RZ-67-Metro Drycleaners, Nepar Wali
Gali, Kapoor Dhage Wali Gali, RZ-107, RZ-44, RZ-140,
RZ-68), Dayal Sar Colony, South Extn., Chanakya Place
(Gali No. 19 and 23 Part-1), T - Block near House
No. 279, and 246.
8.
Replacement of damaged Feeder Boxes in Uttam Nagar
and Janak Puri.
The
following steps needs to be taken in Janak Puri
areas for the upgradation of Electricity Service
being provided at present :
1.
Augumentation of Existing 3 x150mm2 PILCA Cable to
3x300 XLPE Cable between Telecom Indoor to A-1 Mother
Dairy.
2.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A-1 Mother Dairy Indoor to
A-2 140 Plm.
3.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 CLPE Cable between A-2 140 Plm. To A-5 Asalat
Pur
4.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between Narang Colony Indoor to Narang
Colony P/M
5.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between Narang Colony P/M to A-2A
to Kiosk Nale Wala
6.
Augumentation of 630 KVA to 990 KVA Transformer at
A4 Asalatpur Carwala S/Stn.
Work
Complete
7.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A3 I/D JKP to P/M Chander
Nagar, JKP
8.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between Chander Nagar Pole Mounting
to Telecom Colony
9.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between P&T I/D S/STN to A3/109
PL/M JKP
10.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A-3 109 Plm. To A-3 Duggle
Near Bath Centre
11.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A-3 Duggle Plm to Narang
Colony
12.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between District Centre to LIC Plot
No. 13 District Centre (A1 I/D Bansal to A1A I/D)
13.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A1A I/D to A1 I/D Mother
Dairy JKP
14.
Augumentation of Existing 3x150mm2 PILCA Cable to
3x300 XLPE Cable between A1 I/D Bansal to A1 Rich
Harvest School
15.
Augumentation of 400 KVA to 630 KVA Transformer at
A2A Block P/M S/Stn
Work
Complete
16.
Augumentation of 400 KVA to 630 KVA Transformer at
A3 Block Duggal Wala S/Stn.
Work
Complete
17.
Augumentation of 400 KVA to 630 KVA Transformer at
A3 Block MTNL Store
Work
Complete
18.
Augumentation of 400 KVA to 630 KVA Transformer at
P & T Qtr I/D S/STN
19.
Augumentation of 400 KVA to 630 KVA Transformer at
Janta Flat Possangipur I/D S/STN
20.
Augumentation of 400 KVA to 630 KVA Transformer at
Rich Harvesh S/STN U/D
21.
Augumentation of 400 KVA to 630 KVA Transformer at
Narang Colony PL/M S/STN
22.
Augumentation of 400 KVA to 630 KVA Transformer at
A4C I/D
23.
Augumentation of 630 KVA to 990 KVA Transformer at
A4 Asalatpur Carwala S/STN
24.
Augumentation of 630 KVA to 990 KVA Transformer at
Janta Flat Possangipur
Work
Complete
25.
Installation of RMU at A2/140 JKP
26.
Installation of RMU At A3 S/STN St. Marks School,
JKP
27.
Installation of RMU at A3 Block SFS JKP
28.
Installation of RMU at A3 Block MTNL Store JKP
29.
Taking out 2 NO LT FEEDER From 630 KVA After Agumentation
at Chander Nagar
Work
Complete
30.
Taking out 2 NO LT FEEDER From 630 KVA after Agumentation
at A2A BLK JKP
31.
Replacement of Brunt/Demaged Service Pillar at A2
Block, JKP
Work
Complete
32.
Replacement of Brunt/Demanged Service Pillar at A2A
Block, JKP
Work
Complete
33.
Replacement of Brunt/Demaged Service Pillar at P &
T Colony JKP
Work
Complete
34.
Replacement of Brunt/Demaged Service Pillar at A5-B,
JKP
Work
Complete
The
following steps needs to be taken in Uttam Nagar
areas for the upgradation of Electricity Services
being provided at present :
1.
Proposed new 4 Pannel Board at South Ext. Tikona Park,
Uttam Nagar - Z-1502
2.
Installation of new RMU at R & S Block, Chanakya
Place PI/M Z-1502
Work
Complete
3.
Instasllation of new RMU at I J K Block PI/M Z-1502
4.
Installation of new RMU at A & B Block Chanakaya
Place P/M Z-1502
5.
Installation of new RMU at Ram Dutt Enclave (Mother
Dairy) Z-1502
Work
Complete
6.
Replacement of 7 Panel Board at Milap Nagar Z-1502
(D) VKP
7.
Replacement of 5 Panel Board at Chanakya Place No.
1 Z-1502(D) VKP
8.
Replacement of RMU at Clanakya Place No. II Z-1502
(D) VKP
Work
Complete
9.
Replacement of 4 Panel Board at Chanakya Place No.
IV Z-1502 (D) VKP
10.
Replacement of 5 Panel Board to 7 Panel Board at Mohindra
Park I/D S/Stn.
11.
Augumentation of 11 KV cable from 3x150 to 3x300 between
Milap Nagar, and J.J. Colony S/Stn.
12.
Laying of 3x150mm2 11 KV cable for portion that comes
under drain from Jeewan Park to Indra Park S/Stn.
Work
Complete
13.
Replacement of 3x300 CLPE to 300 XLPE from Distt.
Centre to Milap Nagar
14.
Laying of 11KV 3x300 CLPE cable from inter connector
from Chanakya Place No. 1 to Mohindra Park I/D S/Stn.